|
| image = New Asia Athletics Park Station at Night.jpg | image_width = 265px | image_alt = | caption = | type = Rapid transit | system = Kunming Rail Transit | status = Operational | locale = Kunming, China | start = North Bus Station | end = University Town South | stations = 31 | routes = | ridership = | open = | close = | owner = | operator = Kunming Rail Transit Corp., Ltd | character = | depot = | stock = | linelength = | tracklength = | notrack = 2 | gauge = | el = | speed = | elevation = | website = | map = | map_state = collapsed }} The Line 1/2 of the Kunming Rail Transit () is an elevated Metro line that connects the Chenggong with Kunming's urban center. The line is long and currently has thirty-one stops with the North Bus Station as the northern terminal, and University Town South Station as the southern terminal. The line entered into operation on 20 May 2013. On subway maps, the Line's color is red/ blue. Line 1/2 will be split into two operational lines once Line 1 (phase 3) and Line 2 (phase 2) is completed. ==Hours of Operation== Currently the hours of operation for line 1, from 6:00 AM to 12:00 Midnight daily with an 8 minutes interval frequency. Line 1/2 trains travels at speeds of up to . On the initial operation one-way trip will take approximately 34 minutes. 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Line 1, Kunming Rail Transit」の詳細全文を読む スポンサード リンク
|